Interval Data Systems’ portfolio of work includes K-12 schools, colleges and government buildings.
A sample of our most recent work is included below.

Belmont Middle & High School
Belmont, MA
450,000 gsf all-electric building with ground source heat pumps constructed in 2023. Architect: Perkins + Will

Arlington High School
Arlington, MA
408,590 gsf all-electric building with air-to-water heat pumps, constructed in three phases between 2021-2025. Architect: HMFH

Norwood Coakley Middle School
Norwood, MA
187,840 gsf all-electric building with air-source variable refrigerant flow (VRF) constructed in 2025. Architect: Ai3
Pine Hill Elementary School
Westwood, MA
113,141 gsf all-electric building with ground source heat pumps constructed in 2024. Architect: Dore + Whittier
Elmwood Elementary School
Hopkinton, MA
176,000 gsf all-electric building with water-source heat pumps served by geothermal well loop targeting construction by 2027. Architect: Perkins Eastman
David Mindess Elementary School
Ashland, MA
104,885 gsf elementary school with ground-source heat pump chiller system constructed in 2023. Architect: Flansburgh

Watertown High School
Watertown, MA
194,000 gsf – Opening in 2026, this school will be Net Zero using Ground-source heat pumps and roof-top solar and is targeting LEED Platinum designation. Architect: Ai3

Nashoba Regional High School
Bolton, MA
202,000 gsf – All-electric building with ground-source heat pumps. The project will be “net-zero ready” and attain LEED Siver designation. Opening in 2027. Architect: Kaestle Boos Associates

Hatherly Elementary School
Scituate, MA
106,000 gsf – Displacement ventilation system served by packaged DX heat recovery air handling units and high-efficiency gas-fired boiler system. Targeting LEED Silver. Opening in 2027. Architect: Dore + Whittier

Bristol-Plymouth Regional Technical School
Taunton, MA
423,500 gsf all-electric building utilizing GSHP. Designed to be “net zero ready”, the project is tracking to LEED Gold certification. Opening Fall 2026. Architect: HMFH

Revere High School
Revere, MA
106,000 gsf – Air-source heat pump system, with backup high-efficiency gas-fired boiler and roof-mounted solar array. Targeting LEED Silver. Opening in 2027. Architect: Dore + Whittier